Thinbot -- Work in Progress 2-8-2012
Feb. 8th, 2012 11:06 pmToday I disassembled the chiller/nozzle to clean up and polish all the stainless tubing, so I can assemble and leak-test it tomorrow after I've run the polished tubing through the ultrasonic cleaning system at work.
I also did a test assembly of the frame with the lucite base and shelves and the polycarbonate tanks.
( Thinbot frame pix behind the cut )
I also did a test assembly of the frame with the lucite base and shelves and the polycarbonate tanks.
( Thinbot frame pix behind the cut )