kproche: (Default)
[personal profile] kproche
We're getting ready to set up the gate this Saturday on the eastern patio of the Doubletree... with some upgrades


  • Braces cut and drilled to make the frame rigid enough to be freestanding.

  • Frame Spars drilled with second set of holes to bolt into the corner braces

  • A second set of ring arcs painted and cut (out of 3/16" black foamcore under the paint) to put on the reverse of the gate, so it will look good from the back, too.

March 2016

S M T W T F S
  12345
6789101112
13 141516171819
20212223242526
2728293031  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Apr. 22nd, 2026 01:57 pm
Powered by Dreamwidth Studios